North Road https://www.thebatavian.com/ en https://www.thebatavian.com/themes/barrio_batavian/images/thebatavian_logo.png North Road https://www.thebatavian.com/ Local Matters © 2008-2023 The Batavian. All Rights Reserved. Fri, 19 Apr 2024 13:15:54 -0400 https://www.thebatavian.com/themes/barrio_batavian/images/thebatavian_logo.png Fri, 10 Sep 2021 15:04:00 -0400 Paving begins on North Road in Le Roy https://www.thebatavian.com/press-release/paving-begins-on-north-road-in-le-roy/571531 Press release:

Genesee County Highway Department began paving operations on North Road (CR #40) in the Town of Le Roy today.  Paving will initially begin on the aprons and intersection with Rt 19.  Mainline paving on North Road will restart on Monday, Sept. 13 and continue for the remainder of the week. Paving operations will be between Route 19 and the Monroe County line. North Road will be closed to thru traffic during this time for the safety of the highway crews. The road will remain accessible to local traffic, deliveries, school buses, and emergency vehicles. 

]]>
https://www.thebatavian.com/press-release/paving-begins-on-north-road-in-le-roy/571531#comments https://www.thebatavian.com/press-release/paving-begins-on-north-road-in-le-roy/571531 Sep 10, 2021, 3:04pm North Road Paving begins on North Road in Le Roy Press Release <p>Press release:</p> <blockquote> <p>Genesee County Highway Department began paving operations on North Road (CR #40) in the Town of Le Roy today.&nbsp; Paving will initially begin on the aprons and intersection with Rt 19.&nbsp; Mainline paving on North Road will restart on Monday, Sept. 13 and continue for the remainder of</p></blockquote>
Portion of North Road in Le Roy closed for three days next week for water main installation https://www.thebatavian.com/billie-owens/portion-of-north-road-in-le-roy-closed-for-three-days-next-week-for-water-main From the county Highway Department:

Please be advised that North Road in the Town of Le Roy will be closed to traffic between Route 19 and Conlon Road on Monday (Jan. 13), Tuesday (Jan. 14) and Wednesday (Jan. 15) for the installation of a water transmission main line across the roadway.

The roadway will be COMPLETELY CLOSED TO ALL TRAFFIC -- including emergency vehicles. A detour will be posted during this time.

]]>
https://www.thebatavian.com/billie-owens/portion-of-north-road-in-le-roy-closed-for-three-days-next-week-for-water-main#comments https://www.thebatavian.com/billie-owens/portion-of-north-road-in-le-roy-closed-for-three-days-next-week-for-water-main Jan 10, 2020, 1:08pm North Road Portion of North Road in Le Roy closed for three days next week for water main installation Billie Owens <p><em>From the county Highway Department:</em></p> <p>Please be advised that North Road in the Town of Le Roy will be closed to traffic between Route 19 and Conlon Road on Monday (Jan. 13), Tuesday (Jan. 14) and Wednesday (Jan. 15) for the installation of a water transmission main line across the</p>
North Road in Le Roy to be closed to all traffic Thursday and Friday https://www.thebatavian.com/howard-b-owens/north-road-in-le-roy-to-be-closed-to-all-traffic-thursday-and-friday/549539 Press release:

Please be advised that North Road will be closed to traffic between Route 19 and Conlon Road on Thursday and Friday for the installation of a water transmission main across the roadway. The roadway will be COMPLETELY CLOSED TO ALL TRAFFIC -- including emergency vehicles. A detour will be posted during this time.

]]>
https://www.thebatavian.com/howard-b-owens/north-road-in-le-roy-to-be-closed-to-all-traffic-thursday-and-friday/549539#comments https://www.thebatavian.com/howard-b-owens/north-road-in-le-roy-to-be-closed-to-all-traffic-thursday-and-friday/549539 Jan 1, 2020, 6:30pm North Road North Road in Le Roy to be closed to all traffic Thursday and Friday Howard Owens <p><em>Press release:</em></p> <blockquote> <p>Please be advised that North Road will be closed to traffic between Route 19 and Conlon Road on Thursday and Friday for the installation of a water transmission main across the roadway. The roadway will be COMPLETELY CLOSED TO ALL TRAFFIC -- including emergency vehicles. A detour will</p></blockquote>
Water main repairs on North Road in Town of Le Roy resume Monday https://www.thebatavian.com/billie-owens/water-main-repairs-on-north-road-in-town-of-le-roy-resume-monday/549236 From county Highway Superintendent Tim Hens (president, National Association of County Engineers):

Construction of a major 36" diameter water main is occurring along North Road (CR#40) in the Town of Le Roy.

Construction will restart on Monday, Dec. 30th, and will continue for several weeks.

The road will be closed and will only be accessible by local traffic and emergency vehicles during this time. Major delays can be expected.

Complete roadway shutdowns will occur and be communicated as blasting of bedrock and road crossings occur. Alternate routes are suggested.

]]>
https://www.thebatavian.com/billie-owens/water-main-repairs-on-north-road-in-town-of-le-roy-resume-monday/549236#comments https://www.thebatavian.com/billie-owens/water-main-repairs-on-north-road-in-town-of-le-roy-resume-monday/549236 Dec 26, 2019, 3:14pm North Road Water main repairs on North Road in Town of Le Roy resume Monday Billie Owens <p><em>From county Highway Superintendent Tim Hens (president, National Association of County Engineers):</em></p> <p>Construction of a major 36" diameter water main is occurring along North Road (CR#40) in the Town of Le Roy.</p> <p>Construction will restart on Monday, Dec. 30th, and will continue for several weeks.</p> <p>The road will be closed</p>