Skip to main content

Site search

Search results

10 results found

Elba/Byron-Bergen edges Notre Dame in Genesee Region grid battle

By JIM NIGRO

In a battle of unbeaten Genesee Region teams, the Notre Dame Fighting Irish and the Elba-Byron Bergen Lancers squared off Saturday afternoon.

A good part of the opening quarter was a defensive struggle before Elba quarterback Zac Gillard opened the scoring with a one-yard run. The point after attempt failed

Lancers, Blue Devils, Oatkan Knights, Hornets all victorious in week four

By Howard B. Owens

Elba/Byron-Bergen took a 24-7 lead into the final three minutes of its game Saturday against Notre Dame and barely escaped with a victory.

The Fighting Irish mounted a pair of scoring drives and then recovered an onside kick before the Lancer defense snuffed Notre's hopes of going 4-0 on the

New roadway will connect agri-business park to Route 63

By Howard B. Owens

Town of Batavia planners are pushing forward with a proposal to add a second roadway into the Genesee Valley Agri-Business Park, connecting the park with Route 63.

Town Engineer Steve Mountain said the need and opportunity for the roadway is driven by the requirement of the Muller Quaker yogurt plan

Notre Dame notches second win against Oakfield-Alabama

By Howard B. Owens

A Notre Dame offense propelled by Nick Taylor, Tim McCulley and Andrew Mullen dominated on the gridiron Saturday against Oakfield-Alabama.

With a 32-0 win, the Fighting Irish move to 2-0 while the Hornets top to 0-2.

Taylor carried the ball 15 times for 161 yards and one TD. McCulley tossed

GCEDC mum on whether Genesee County was in running for new Coca-Cola dairy processing plant

By Howard B. Owens
HP Hood Ag Park

There just isn't enough room in the Genesee Valley Ag Park on the east side of the Town of Batavia for a project as large as the Fairlife plant announced today in Monroe County.

The 745,000-square-foot facility will be built by Coca-Cola and create an estimated 250 jobs in the Town of Webster.  The company is expected to invest $650 million in the project.

Biogas plant on the drawing board for ag park since 2014 reemerges in planning process

By Howard B. Owens
digester tank

A long-discussed plan to build a biogas plant in the Genesee Valley Agri-business Park in the Town of Batavia is again moving forward with the recommended approval on Thursday of a height variance for a storage tank on the property.

CH4 Biogas of Covington, operating the business name Genesee Biogas for the project,  first proposed the plant in 2014. 

Sara Gilbert, of Pinewood Engineering, asked the board to Genesee County Planning Board on Thursday to recommend approval for the company to build a digester storage tank taller than allowed by zoning code.  The biogas plant seeks approval for an 83.5-foot tall digester tank.

Roz Steiner gallery to feature alumni artworks

By Billie Owens

Press release:

Amid the joy of reuniting with friends and professors, the big hair and '80s tribute bands, and the great food and good times that will mark Homecoming at Genesee Community College in September, will be inspiring artwork created by GCC alumni.

The Roz Steiner Art Gallery will showcase

Authentically Local